Retro-fit Square-dot 2D code marking station including
A. Heavy duty all steel machine base fabricated with floor leveling screws and transfer line tapping plate
B. All necessary air control valves mounted piped and wired
C. Air inline coalescent air filtration
D. Air inline 5 micro main filter, pressure regulator, and mark depth regulator
E. Air inline manual only air shutoff lockout valve
F. All necessary tag out, lockout tags, and identification labels
G.***Mounting of current CEP Video Jet ink marking system (component currently on Video Jet stand)
H. Mount and install CMT DPS150 Square-Dot marking system
J. Air powered marking slide to provide proper diamond pin to part distance with positive adjustable stop
K. Painted machine enamel per Custom color paint specification
L. (8) hour cycle test at CMT prior to shipping
M. Crated for shipping to Ford CEP plant via truck
N. (1) machine mounted Insight 5100 vision system
Electrical control system including:
A. Machine mounted electrical enclosure for retro-fit purpose. Size and shape may not meet standards
B. High voltage Sola isolation power transformer
C. High voltage power disconnect with fuses and lockout
D. All controls mounted and installed (vision, marker, and machine)
E. Wire way and terminal strip to Ford specifications
F. All necessary I/O points wired and installed
G. Panel mounted (door face or panel side pending floor plan approval) master start, stop, and indicator lights
H. Panel painted inside and outside machine enamel to customer color specification
Marked code vision reading and verification system including: